Flying in the second module

Module 2 arrived promptly and rolled up to the crane without a problem.

The crane lowered to rectangular hoisting fram over it as workers on one side passed the steel straps under the module to workers on the opposite side, who held a strap up for another worker to hook to the frame.

Soon both fornt and rear straps were connected to the frame and the crane began lifting it, tightening the straps under the module, and slowly lifting it. This time the load appeared unbalanced as the forward end was much lower than the rear.

However, no one panicked, the four workes on the ground positioned one end first, then the other, cinching it next to the first module. Two modules made half a house!